All papers

Further Maths · Edexcel 9FM0 · Paper 4D: Decision Mathematics 2 · June 2022

Edexcel A Level Further Maths Paper 4D: Decision Mathematics 2 June 2022 question paper 9FM0/4D

1h 30m 75 marks

Practise the past exam questions by topic

Edexcel 9FM0 · Paper 4D

8 questions
Report a problem
What is wrong?

Goes to whoever maintains the question split. No account needed and nothing is published on this page.

Question 1

Four workers, A, B, C and D, are to be assigned to four tasks, 1, 2, 3 and 4. Each task must be assigned to just one worker and each worker must do only one task.

The cost of assigning each worker to each task is shown in the table below.

The total cost is to be minimised.

1234
A32453448
B37395046
C46444042
D43454852
(a)

Reducing rows first, use the Hungarian algorithm to obtain an allocation that minimises the total cost. You must make your method clear and show the table after each stage.

(5)

(b)

State the minimum total cost.

(1)

Question 3

The table below shows the transport options, usual travel times, possible delay times and corresponding probabilities of delay for a journey. All times are in minutes.

Transport optionUsual travel timePossible delay timeProbability of delay
Car5210 250.10 0.02
Train4515 250.05 0.03
Coach555 150.05 0.01
(a)

Draw a decision tree to model the transport options and the possible outcomes.

(5)

(b)

State the minimum expected travel time and the corresponding transport option indicated by the decision tree.

(2)

Question 4

Figure for question 4

Figure 1 shows a capacitated, directed network of pipes. The uncircled number on each arc represents the capacity of the corresponding pipe. The numbers in circles represent an initial flow.

(a)

List the saturated arcs.

(1)

(b)

State the value of the initial flow.

(1)

(c)

Explain why arc FT cannot be full to capacity.

(1)

(d)

State the capacity of cut C1 and the capacity of cut C2

(2)

(e)

By inspection find one flow‑augmenting route to increase the flow by three units. You must state your route.

(1)

(f)

Prove that, once the flow‑augmenting route found in part (e) has been applied, the flow is maximal.

(3)

Question 5

A standard transportation problem is described in the linear programming formulation below.

Let xij be the number of units transported from i to j

where maths symbol i i maths symbol {A, B, C, D}

Question 5, shown as an image

Minimise P maths symbolxAR + 17xAS + 24xAT + 15xBR + 29xBS + 32xBT

Question 5, shown as an image

subject to

Question 5, shown as an image

Given that the problem is balanced,

(a)

state the value of k.

(1)

(b)
Question 5, shown as an image

transportation problem.

(2)

(c)

Use the north‑west corner method to obtain the cost of an initial solution to this transportation problem.

(2)

(d)

Perform one iteration of the stepping‑stone method to obtain an improved solution. You must make your method clear by showing the route and the

• shadow costs

• improvement indices

• entering cell and exiting cell.

(4)

Question 6

Bernie makes garden sheds. He can build up to four sheds each month.

If he builds more than two sheds in any one month, he must hire an additional worker at a cost of £250 for that month.

In any month in which sheds are made, the overhead costs are £35 for each shed made that month.

A maximum of three sheds can be held in storage at the end of any one month, at a cost of £80 per shed per month.

Sheds must be delivered at the end of the month.

The order schedule for sheds is

MonthJanuaryFebruaryMarchAprilMay
Number ordered13352

There are no sheds in storage at the beginning of January and Bernie plans to have no sheds left in storage after the May delivery.

Use dynamic programming to determine the production schedule that minimises the costs given above. Complete the working in the table provided in the answer book and state the minimum cost.

(14)

Question 7

Figure for question 7

A two person zero‑sum game is represented by the pay‑off matrix for player A shown above. It is given that k is an integer.

(a)

Show that Q is the play‑safe option for player A regardless of the value of k.

(2)

(b)

Given that Z is the play‑safe option for player B,

determine the range of possible values of k. You must make your working clear.

(2)

(c)

Explain why player B should never play option X. You must make your reasoning clear.

(2)

(d)(i)

Player A intends to make a random choice between options Q, R and S, choosing option Q with probability p1, option R with probability p2 and option S with probability p3

Player A wants to find the optimal values of p1, p2 and p3 using the Simplex algorithm.

Given that k maths symbol –4, player A formulates the following objective function for the corresponding linear program.

Maximise P = V, where V = the value of the original game + 4

Formulate the constraints of the linear programming problem for player A. You should write the constraints as equations.

(d)(ii)

Write down an initial Simplex tableau, making your variables clear.

(7)

(e)

The Simplex algorithm is used to solve the linear programming problem. It is given that in the final Simplex tableau the optimal value of p = fraction, the optimal value of p = fraction and all the slack variables are zero.

Determine the value of k, making your method clear.

(4)

Question 8

The owner of a new company models the number of customers that the company will have at the end of each month. The owner assumes that

• a constant proportion, p (where 0 maths symbol p maths symbol 1), of the previous month’s customers will be retained for the next month

• a constant number of new customers, k, will be added each month.

Let un (where n maths symbol 1) represent the number of customers that the company will have at the end of n months.

The company has 5000 customers at the end of the first month.

(a)

By setting up a first order recurrence relation for un+ 1 in terms of un, determine an expression for un in terms of n, p and k.

(6)

(b)

The owner believes that 95% of the previous month’s customers will be retained each month and that there will be 10 000 new customers each month.

According to the model, the company will first have at least 135 000 customers by the end of the m th month.

Using logarithms, determine the value of m.

(3)

The paper as printed

Spotted a mistake on this page?Report a problem