Critical path analysis

11 questions · 139 marks · about 3 hours

Critical path analysis questions

Edexcel 9371 Critical path analysis 11 questions

Decision Mathematics 1 June 2017, Question 6 11 marks

Figure for question 6

A project is modelled by the activity network shown in Figure 6. The activities are represented by the arcs. The number in brackets on each arc gives the time, in days, to complete the corresponding activity. Each activity requires exactly one worker. The project is to be completed in the shortest possible time.

(a)

Complete Diagram 1 in the answer book to show the early event times and the late event times.

[4]
Reveal mark scheme Mark scheme for question 6(a)
(b)

Draw a Gantt chart for the project on the grid provided in the answer book.

[4]
Reveal mark scheme Mark scheme for question 6(b)
(c)

State the activities that must be happening at time 18.5

An additional activity, P, is now included in the activity network shown in Figure 6. Activity P is immediately preceded only by activity D. No activity is dependent on the completion of activity P. Each activity still requires exactly one worker and the revised project is to be completed in the shortest possible time.

[1]
(d)

Explain, briefly, whether or not the revised project can be completed in the same time as the original project if the duration of activity P is

Reveal mark scheme Mark scheme for question 6(d)
(d)(i)

10 days

(d)(ii)

17 days

[2]

Decision Mathematics 1 June 2016, Question 2 5 marks

Draw the activity network described in the precedence table below, using activity on arc and exactly three dummies.

ActivityImmediately preceding activities
Aโ€“
Bโ€“
CA
DA
EB
FB
GA, E, F
HF
IC
JD, G
KD, G
[5]
Reveal mark scheme Mark scheme for question 2

Decision Mathematics 1 June 2016, Question 7 12 marks

Figure for question 7

The network in Figure 6 shows the activities that need to be undertaken by a company to complete a project. Each activity is represented by an arc and the duration, in days, is shown in brackets. Each activity requires exactly one worker. The early event times and late event times are shown at each vertex. Given that the total float on activity D is 1 day,

(a)

find the values of w, x, y and z.

[3]
Reveal mark scheme Mark scheme for question 7(a)
(b)

On Diagram 1 in the answer book, draw a cascade (Gantt) chart for the project.

[4]
Reveal mark scheme Mark scheme for question 7(b)
(c)

Use your cascade chart to determine a lower bound for the minimum number of workers needed to complete the project in the shortest possible time. You must make specific reference to times and activities.

It is decided that the company may use up to 36 days to complete the project.

[2]
(d)

On Diagram 2 in the answer book, construct a scheduling diagram to show how the project can be completed within 36 days using as few workers as possible.

[3]
Reveal mark scheme Mark scheme for question 7(d)

Decision Mathematics 1 June 2015, Question 7 13 marks

ActivityTime taken (days)Immediately preceding activities
A5-
B7-
C8-
D5A
E7A
F10B, C
G4B, C
H9C
I8G, H
J12G, H
K7D
L10E, F, I, J

The table shows the activities required for the completion of a building project. For each activity the table shows the time taken, in days, and the immediately preceding activities. Each activity requires one worker. The project is to be completed in the shortest possible time.

Figure for question 7

Figure 6 shows a partially completed activity network used to model the project. The activities are represented by the arcs and the numbers in brackets on the arcs are the times taken, in days, to complete each activity.

(a)

Add activities, E, F and I, and exactly one dummy to Diagram 1 in the answer book.

[3]
Reveal mark scheme Mark scheme for question 7(a)
(b)

Complete Diagram 1 in the answer book to show the early event times and late event times.

[4]
Reveal mark scheme Mark scheme for question 7(b)
(c)

Calculate a lower bound for the number of workers needed to complete the project in the shortest possible time. You must show your working.

[2]
(d)

Schedule the activities, using the minimum number of workers, so that the project is completed in the minimum time.

[4]
Reveal mark scheme Mark scheme for question 7(d)

Decision Mathematics 1 June 2013 (R), Question 3 12 marks

Figure for question 3

A project is modelled by the activity network shown in Figure 3. The activities are represented by the arcs. The number in brackets on each arc gives the time, in days, to complete the activity. Each activity requires one worker. The project is to be completed in the shortest possible time.

(a)

Complete Diagram 1 in the answer book to show the early event times and late event times.

[4]
Reveal mark scheme Mark scheme for question 3(a)
(b)

Calculate the total float for activity H. You must make the numbers you use in your calculation clear.

[2]
(c)

Calculate a lower bound for the number of workers needed to complete the project in the shortest possible time. Show your calculation.

Diagram 2 in the answer book shows a partly completed scheduling diagram for this project.

[2]
Reveal mark scheme Mark scheme for question 3(c)
(d)

Complete the scheduling diagram, using the minimum number of workers, so that the project is completed in the minimum time.

[4]
Reveal mark scheme Mark scheme for question 3(d)

Decision Mathematics 1 June 2013 (R), Question 6 7 marks

ActivityImmediately preceding activities
Aโ€“
Bโ€“
CA
DA
EB
FC D
GD
HF G
IH
JH
KI J
(a)

Draw the activity network described in the precedence table, using activity on arc and exactly two dummies.

[5]
Reveal mark scheme Mark scheme for question 6(a)
(b)

Explain why each of the two dummies is necessary.

[2]
Reveal mark scheme Mark scheme for question 6(b)

Decision Mathematics 1 June 2013, Question 7 17 marks

Figure for question 7

[ The sum of the duration of all activities is 172 days ] A project is modelled by the activity network shown in Figure 5. The activities are represented by the arcs. The number in brackets on each arc gives the time, in days, to complete the activity. Each activity requires one worker. The project is to be completed in the shortest possible time.

(a)

Complete Diagram 1 in the answer book to show the early event times and late event times.

[4]
Reveal mark scheme Mark scheme for question 7(a)
(b)

Calculate the total float for activity M. You must make the numbers you use in your calculation clear.

[2]
(c)

For each of the situations below, explain the effect that the delay would have on the project completion date.

(c)(i)

A 2 day delay on the early start of activity P.

(c)(ii)

A 2 day delay on the early start of activity Q.

[2]
(d)

Calculate a lower bound for the number of workers needed to complete the project in the shortest possible time.

Diagram 2 in the answer book shows a partly completed cascade chart for this project.

[1]
(e)

Complete the cascade chart.

[4]
Reveal mark scheme Mark scheme for question 7(e)
(f)

Use your cascade chart to determine a second lower bound on the number of workers needed to complete the project in the shortest possible time. You must make specific reference to times and activities.

[2]
(g)

State which of the two lower bounds found in (d) and (f) is better. Give a reason for your answer.

[2]
Reveal mark scheme Mark scheme for question 7(g)

Decision Mathematics 1 January 2013, Question 7 16 marks

Figure for question 7

Figure 7 is the activity network relating to a building project. The activities are represented by the arcs. The number in brackets on each arc gives the time to complete the activity. Each activity requires one worker. The project must be completed in the shortest possible time.

(a)

Explain the reason for the dotted line from event 4 to event 6 as shown in Figure 7.

[2]
Reveal mark scheme Mark scheme for question 7(a)
(b)

Complete Diagram 1 in the answer book to show the early event times and the late event times.

[4]
Reveal mark scheme Mark scheme for question 7(b)
(c)

State the critical activities.

[1]
Reveal mark scheme Mark scheme for question 7(c)
(d)

Calculate the total float for activity G. You must make the numbers you use in your calculation clear.

[2]
(e)

Draw a Gantt chart for this project on the grid provided in the answer book.

[4]
Reveal mark scheme Mark scheme for question 7(e)
(f)

State the activities that must be happening at time 5.5

[1]
(g)

Use your Gantt chart to determine the minimum number of workers needed to complete the project in the minimum time. You must justify your answer.

[2]
Reveal mark scheme Mark scheme for question 7(g)

Decision Mathematics 1 June 2012, Question 6 14 marks

Figure for question 6

Figure 5 is the activity network relating to a development project. The activities are represented by the arcs. The number in brackets on each arc gives the time, in days, to complete the activity. Each activity requires one worker. The project is to be completed in the shortest possible time.

(a)

Complete the precedence table in the answer book.

[2]
Reveal mark scheme Mark scheme for question 6(a)
(b)

Complete Diagram 1 in the answer book to show the early event times and late event times.

[4]
Reveal mark scheme Mark scheme for question 6(b)
(c)

Calculate the total float for activity E. You must make the numbers you use in your calculation clear.

[2]
Reveal mark scheme Mark scheme for question 6(c)
(d)

Calculate a lower bound for the number of workers needed to complete the project in the minimum time. You must show your working.

[2]
Reveal mark scheme Mark scheme for question 6(d)
(e)

Schedule the activities using the minimum number of workers so that the project is completed in the minimum time.

[4]
Reveal mark scheme Mark scheme for question 6(e)

Decision Mathematics 1 June 2011, Question 7 16 marks

Figure for question 7

A project is modelled by the activity network shown in Figure 7. The activities are represented by the arcs. The number in brackets on each arc gives the time, in days, to complete the activity. Each activity requires one worker. The project is to be completed in the shortest possible time.

Reveal mark scheme Mark scheme for question 7
(a)

Complete the precedence table in the answer book.

[3]
Reveal mark scheme Mark scheme for question 7(a)
(b)

Complete Diagram 1 in the answer book, to show the early event times and late event times.

[4]
Reveal mark scheme Mark scheme for question 7(b)
(c)

State the critical activities.

[2]
Reveal mark scheme Mark scheme for question 7(c)
(d)

On the grid in your answer book, draw a cascade (Gantt) chart for this project.

[4]
Reveal mark scheme Mark scheme for question 7(d)
(e)

By considering the activities that must take place between time 7 and time 16, explain why it is not possible to complete this project with just 3 workers in the minimum time.

[3]
Reveal mark scheme Mark scheme for question 7(e)

Decision Mathematics 1 January 2011, Question 7 16 marks

Figure for question 7

The network in Figure 7 shows the activities that need to be undertaken to complete a maintenance project. The activities are represented by the arcs. The number in brackets on each arc gives the time, in days, to complete the activity. The numbers in circles are the events. Each activity requires one worker. The project is to be completed in the shortest possible time.

Reveal mark scheme Mark scheme for question 7
(a)

Complete the precedence table for this network in the answer book.

[3]
Reveal mark scheme Mark scheme for question 7(a)
(b)

Explain why each of the following is necessary.

Reveal mark scheme Mark scheme for question 7(b)
(b)(i)

The dummy from event 6 to event 7.

(b)(ii)

The dummy from event 8 to event 9.

[3]
(c)

Complete Diagram 2 in the answer book to show the early and the late event times.

[4]
Reveal mark scheme Mark scheme for question 7(c)
(d)

State the critical activities.

[2]
Reveal mark scheme Mark scheme for question 7(d)
(e)

Calculate the total float on activity K. You must make the numbers used in your calculation clear.

[2]
Reveal mark scheme Mark scheme for question 7(e)
(f)

Calculate a lower bound for the number of workers needed to complete the project in the minimum time.

[2]
Reveal mark scheme Mark scheme for question 7(f)

Report a problem with a question on this page
What is wrong?

Goes to whoever maintains the question split. No account needed and nothing is published on this page.

Memes

Certified Maths memes. Peer-reviewed by nobody.

Laugh now. Cry in the exam hall later. Then come back and do a past paper.

Learn the formula
Draw a vague triangle and hope
Me with 4 minutes left on Paper 3
Using a calculator
Using the formula sheet
Doing it in your head
Writing โ€˜by inspectionโ€™ and walking out
Maths enlightenment, ranked

Mum ๐Ÿ’–

did you do your maths homework sweetie?? ๐Ÿฅฐ

yes I solved for x

proud of you!!!

๐Ÿ“ฑ Screen time this week ยท TikTok6h 7m

x was never found

Maths starter pack

Protractor you've never usedCalculator older than youโ€œShow your workingโ€ traumaThis website
Collect all four