All papers

Maths · Eduqas C300 · Component 2H · Higher · November 2021

Eduqas GCSE Maths Component 2H Higher November 2021 question paper

Eduqas C300 · Component 2H

21 questions
Report a problem
What is wrong?

Goes to whoever maintains the question split. No account needed and nothing is published on this page.

Question 1

(a)

1. (a) Solve6x maths symbol1maths symbol 5 maths symbol x.

[2]

Answer
Mark scheme for question 1(a)
(b)

Abby, Ben and Ceri are solving a puzzle.

Abby takes x seconds. Ben takes 5 seconds more than Abby. Ceri takes twice as long as Ben.

Ceri takes 116 seconds to solve the puzzle.

Use an algebraic method to find how long Abby takes to solve the puzzle.

You must show all your working.

Abby takes........ seconds

[3]

Answer
Mark scheme for question 1(b)

Question 2

Tori’s grandfather buys a gold coin for her on the day she is born.

The coin costs £130. The value of the coin is expected to increase by 6% each year.

What value is the coin expected to have on Tori’s 10th birthday?

Give your answer correct to the nearest penny.

Expected value of the coin £........

[3]

Answer
Mark scheme for question 2

Question 3

The circumference of a circle is 40·841 cm.

Find the area of this circle.

You must show all your working.

[4]

Answer
Mark scheme for question 3

Question 4

(a)

4. (a) The diagram shows the side view of a design for a ramp to a building.

Figure for question 4

For the design to be approved, the angle of rise must not be more than 4·8°.

Use calculations to show that the design should be approved.

[3]

Answer
Mark scheme for question 4(a)
(b)
Figure for question 4

The diagram shows a concrete ramp to a different building. It was not approved and needs to be completely removed.

The ramp is a triangular prism and is 2·5 m wide.

How many cubic metres of concrete will need to be removed?

You must show all your working.

[5]

Answer
Mark scheme for question 4(b)

Question 5

(a)
Figure for question 5

p and q are translation vectors with

Question 5, shown as an image

Shape A is mapped to shape B using p + 2q.

(a)(i)

Find the column vector which translates shape A to shape B.

[2]

Answer
Mark scheme for question 5(a)(i)
(a)(ii)

Draw and label shape B on the grid on page 8.

[2]

Answer
Mark scheme for question 5(a)(ii)
(b)

Triangle C has vertices with coordinates (4, 3), (6, 5), (6, 0). After a single transformation, the vertices of triangle C are mapped to (3, 4), (5, 6), (0, 6).

Describe the transformation.

You may use this grid to help you

Figure for question 5

Transformation:........

[2]

Answer
Mark scheme for question 5(b)

Question 6

A tram company sells all-day tickets.

1 adult ticket and 4 child tickets cost a total of £16.30. 2 adult tickets and 3 child tickets cost a total of £19.10.

Use an algebraic method to find the total cost of 3 adult tickets and 1 child ticket.

[5]

Answer
Mark scheme for question 6

Question 7

(a)

7. (a) Expand and simplify.(x maths symbol 6)(7x+5)

[3]

Answer
Mark scheme for question 7(a)
(b)

Factorise.y2 maths symbol 2y maths symbol 8

[2]

Answer
Mark scheme for question 7(b)

Question 8

The table shows the time, t minutes, taken by 600 people travelling to a flower show by car.

Time, t (minutes)Frequency
20 t 4068
40 t 80186
80 t 100238
100 t 150108
(a)

Calculate an estimate of the mean travelling time for these 600 people.

You must show all your working.

[4]

Answer
Mark scheme for question 8(a)
(b)

Road works delayed each of these 600 people by 3 minutes.

What would the mean travelling time have been without these road works?

[1]

Answer
Mark scheme for question 8(b)

Question 9

Figure for question 9
(a)

Complete the table above.

[1]

Answer
Mark scheme for question 9(a)
(b)
Figure for question 9

[2]

Answer
Mark scheme for question 9(b)
(c)

Write down the roots of.x2 maths symbol 2x maths symbol 3 maths symbol 0

[1]

Answer
Mark scheme for question 9(c)
(d)

Use your graph to solve the simultaneous equations

[3]

Answer
Mark scheme for question 9(d)

Question 10

(a)

10. (a) Find the next term of each of the following sequences.

(a)(i)

2, 9, 11, 20, 31, 51,...

[1]

Answer
Mark scheme for question 10(a)(i)
(a)(ii)
Question 10, shown as an image

[1]

Answer
Mark scheme for question 10(a)(ii)
(b)

Find the nth term of the following sequence.

2, 6, 12, 20, 30,...

[2]

Answer
Mark scheme for question 10(b)
(c)

The numbers 4, 6, and 8 are three consecutive even integers.

Complete the following proof to show that the sum of any three consecutive even integers

is a multiple of 6.

Proof:

Every even number is a multiple of 2.

Let the smallest of the three even numbers be 2n, where n is an integer.

The second of the three even numbers must be........

and the third of the three even numbers must be........

[3]

Answer
Mark scheme for question 10(c)

Question 11

Figure for question 11

What was the purchase price of the car?

[4]

Answer
Mark scheme for question 11

Question 12

Figure for question 12

[4]

Answer
Mark scheme for question 12

Question 13

(a)

13. (a) Rita has a box containing 12 buttons, 5 are white (W) and the rest are blue (B). Rita takes 2 buttons from the box at random, without replacement.

Complete the tree diagram.

First Second

Figure for question 13

[3]

Answer
Mark scheme for question 13(a)
(b)

Calculate the probability that at least one of the buttons Rita takes from the box is white.

[2]

Answer
Mark scheme for question 13(b)
(c)

Rita puts the 2 buttons back into the box. She then takes 3 buttons from the box at random, without replacement. What is the probability that the second and the third buttons she takes are both blue?

[3]

Answer
Mark scheme for question 13(c)

Question 14

At the end of 2020, the population, P0, of a particular type of insect on an island was estimated to be 25 000.

Anwar and Irina are scientists studying these insects.

Anwar uses this iterative formula to predict the population of the insects, Pn, n years after the end of 2020.

P0 = 25 000

Pn+1= 1·12Pn where n ≥ 0 and n is an integer

(a)

Use Anwar’s formula to predict the population at the end of 2021.

[1]

Answer
Mark scheme for question 14(a)
(b)

Use Anwar’s formula to predict the increase in population during the year 2025.

You must show all your working.

Increase in population =........ insects

[3]

Answer
Mark scheme for question 14(b)
(c)
Figure for question 14

[2]

Answer
Mark scheme for question 14(c)

Question 15

The diagram shows a candle. It is made by removing a small pyramid of wax from the top of a large pyramid of wax, to expose the wick.

Figure for question 15

Diagram not drawn to scale

The perpendicular height of the large pyramid is 24 cm. The base of the large pyramid is a square with sides 12 cm. The base of the small pyramid that is removed is a square with sides 2 cm.

The density of the candle wax is 0·9 g / cm3.

Figure for question 15
(a)

Calculate the mass of the candle.

State one assumption you make.

[7]

Answer
Mark scheme for question 15(a)
(b)

Describe the impact of your assumption on your answer to part (a).

[1]

Answer
Mark scheme for question 15(b)

Question 16

Figure for question 16

Tom rides his motorbike for 187·5 miles, correct to the nearest fraction mile. On this journey his motorbike uses 4·8 litres of fuel, correct to the nearest 0·4 litre. The fuel economy of Tom’s motorbike is k kilometres per litre.

What is the smallest possible value of k?

Figure for question 16

Smallest possible value of k is........

[5]

Answer
Mark scheme for question 16

Question 17

(a)

17. (a) How many 8-digit numbers can be made using the digits 2, 3, 4, 5, 6, 7, 8, 9 when each

digit is used once?

[2]

Answer
Mark scheme for question 17(a)
(b)

How many 6-digit numbers which start with a prime number can be made using the digits

2, 3, 4, 5, 6, 7, 8, 9 when each digit may be used at most once?

[2]

Answer
Mark scheme for question 17(b)

Question 18

The diagram shows Zac’s height from 8 to 18 years of age.

Figure for question 18
(a)

Find Zac’s rate of growth on his 17th birthday.

[1]

Answer
Mark scheme for question 18(a)
(b)

What is Zac’s average rate of growth per year between his 10th and 15th birthdays?

You must show all your working.

[3]

Answer
Mark scheme for question 18(b)

Question 19

Solve the following equation.

Give your answers correct to 2 decimal places.

[7]

Answer
Mark scheme for question 19

Question 20

The diagram shows the journey of a small boat.

Figure for question 20

The boat sails from point P on a bearing of 030° for 50 km. When it reaches point Q, it changes direction and travels to point R on a bearing of 161° for 72 km.

(a)
Figure for question 20

[1]

Answer
Mark scheme for question 20(a)
(b)

The triangular area PQR is to be searched to locate a shipwreck.

Calculate this area.

[2]

Answer
Mark scheme for question 20(b)
(c)

Calculate the bearing of P from R.

Give your answer correct to the nearest degree.

[7]

Answer
Mark scheme for question 20(c)

Question 21

The following probabilities are given for events A and B.

(a)

By drawing a Venn diagram or otherwise, find the probability that A occurs or B occurs

but they do not both occur.

[3]

Answer
Mark scheme for question 21(a)
(b)

Find.P(A' maths symbol B')

[2]

Answer
Mark scheme for question 21(b)

The paper as printed

Spotted a mistake on this page?Report a problem